Bid Bonds, Explained: The Bid Guarantee That Lets Small Contractors Compete for Federal Work
Federal solicitations demand a bid guarantee worth 20% of your bid, capped at $3M — default and you owe the spread to the next bidder.
#job-costing
Track costs per project or job for accurate profitability analysis

Federal solicitations demand a bid guarantee worth 20% of your bid, capped at $3M — default and you owe the spread to the next bidder.

AI agents code construction invoices to job and cost code and draft change orders — same-day documentation recovers 85 to 95 percent of added costs.

An estimate needs six sections — expiry, scope, line items, assumptions, exclusions, payment terms — or the price means different things to each side.

Underapplied overhead means actual spending beat applied overhead — close a small variance to COGS, prorate a material one across WIP, finished goods, and COGS.

A CM at risk caps cost with a guaranteed maximum price and open books; a GC bids fixed on finished drawings — pick by design status.

Direct federal buys follow the Buy American Act while grant-funded infrastructure follows BABA - 100% US iron and steel, 55% domestic manufactured products.

When two responsible small firms can perform at a fair price, the contract is set aside; certified firms can win direct awards up to $5.5M.

Fixed-price puts overrun risk on you; cost-plus puts it on the client. Price either from burdened labor, add overhead recovery, and track each job weekly.

Keep 80 to 150 accounts and tag each line by project, customer, or cost center — one Travel account with tags replaces dozens of Travel-Project-X accounts.

US tariffs added about $5 to every blank garment. Bill setup fees separately, amortize digitizing files across units, and reprice quotes from landed cost.

Customer deposits are liabilities, not revenue — book them right, charge mobilization honestly, and job-cost every build by code.

Bid drainage tile by the foot: 30-foot spacing doubles footage per acre versus 60-foot. Price the outlet separately, and use Section 179 on the plow.