#job-costing
Job Costing
Track costs per project or job for accurate profitability analysis
Commercial Drone Photography Bookkeeping: Part 107, Section 179, Battery Cycles, and Stock Footage Royalties
How to set up books for a Part 107 commercial drone business — separate revenue lines by service type, capitalize airframes and payloads as distinct assets, track per-flight battery cycles as cost of service, and apply the 2025 permanent 100% bonus depreciation under OBBBA.
Tree Service Bookkeeping: Cost-Per-Hour, Workers' Comp Class 0106, Section 179, and Seasonal Cash Flow
How tree care companies should structure their books — separating workers' comp class 0106 payroll, allocating bucket truck and chipper hours per job, reserving for e-mod surges, and pricing crews off a true burdened cost-per-hour rate.
Bookkeeping for Local and Long-Distance Moving Companies: Carriers, Brokers, Fuel Surcharges, and Driver Settlements
Build a chart of accounts that separates carrier revenue from broker pass-throughs, handles fuel surcharges and packing inventory correctly, and reconciles driver settlements against bills of lading — the bookkeeping discipline that protects margin in local and long-distance moving operations.
How to Read a Construction WIP Schedule: Percentage-of-Completion, Over- and Under-Billing
A construction WIP schedule recognizes revenue as work is performed using cost-to-cost percentage-of-completion, then exposes over- and under-billing on every job — the report banks and surety underwriters read before the income statement.
Job Costing for Contractors: Labor Burden, Cost Codes, and Committed Costs
Job costing assigns every dollar of cost to the job that caused it. Fully burdened labor runs 30 to 50 percent above base wage, overhead is applied with a predetermined rate, and committed costs reveal a budget overrun before the invoices arrive — read the variance column weekly.
The Construction WIP Schedule: Percentage-of-Completion Accounting Under ASC 606
How construction contractors use the work-in-progress schedule and ASC 606 percentage-of-completion accounting to surface overbillings, underbillings, profit fade, and the financial signals sureties and banks actually read.
Surety Bonds for Construction Contractors: Miller Act, SBA Guarantees, and the Books That Build Bonding Capacity
How bid, performance, and payment bonds work in 2026 for small construction contractors — the Miller Act's $35K and $150K federal thresholds, the SBA's 80–90% guarantee covering contracts up to $14 million, and the working-capital and WIP discipline that decides which builders get bonded for the largest jobs.
Surety Bonds for Construction Contractors: How the Miller Act and SBA Guarantee Program Open Public Works to Small Builders
Public construction contracts above the FAR $150,000 threshold require performance and payment bonds under the Miller Act, with state Little Miller Acts setting thresholds from $25,000 to $500,000. The SBA Surety Bond Guarantee Program—which guaranteed $10.6 billion in bonds for 2,200+ small businesses in FY2025—lets approved sureties write bonds for small contractors by absorbing 80–90% of loss risk.
AIA Pay Applications, Retainage, and WIP Schedules: How Construction Billing Ties to GAAP Revenue Recognition
AIA G702 and G703 pay applications, schedules of values, retainage, WIP schedules, and over/underbilling reconciliations are what tie construction billing to GAAP revenue recognition under ASC 606. Here is how each piece works, why a $312 line error can delay a $1.4M wire by 41 days, and the patterns that rattle sureties.
DCAA Audit Compliance for Government Contractors: SF 1408, Timekeeping, and Incurred Cost Submissions
A practical guide to the three audits every cost-reimbursable federal contractor faces — the SF 1408 pre-award accounting system survey, daily timekeeping compliance, and the Incurred Cost Submission due six months after fiscal year-end — with a 90-day preparation plan and the five most common audit findings.
Percentage of Completion vs Completed Contract: A Contractor's Guide to Construction Revenue Recognition
A side-by-side comparison of the Percentage of Completion (PCM) and Completed Contract (CCM) methods for construction revenue recognition, with worked examples, ASC 606 over-time criteria, the IRC Section 460 small contractor exception (~$31M for 2026), WIP schedule mechanics, and the overbilling/underbilling traps that wreck contractor cash flow.
Construction Accounting: A Complete Guide for Contractors and Small Builders
Learn the essentials of construction accounting including job costing, revenue recognition methods, WIP schedules, retainage tracking, and change order management. A practical guide for contractors and small builders.